Public Schools

Goshen Central School District, Goshen, NY

Goshen High School

  • Goshen High School 18,000 square foot addition including new classrooms and administration offices
  • Renovations to existing building for classrooms, kitchen, cafeteria, auditorium and a new STEAM lab
  • Replacement of air handling units in auditorium and cafeteria, new air conditioning in kitchen expansion
  • New athletic facility; locker rooms, toilets, offices and concession area
  • LED field lighting for football stadium and practice field

 

    District Wide Capital Improvement Projects

    C.J. Hooker Middle School, Goshen Intermediate School, Scotchtown Avenue School and Goshen High School

    • Air Conditioning and ventilation for main office/guidance office suite in Goshen High School.
    • Upgrades and modifications to district wide DDC system.
    • Replace unit ventilator controls in C.J. Hooker Middle School and update HVAC digital control hardware.
    • Installation of ducted classroom exhaust for C.J. Hooker Middle School and Goshen Intermediate School.
    • Replace multiple air handler units and exhaust fans throughout district and interconnect new equipment with DDC system.
    • Upgrade generator motorized damper controls in Goshen Intermediate School from pneumatic to DDC.

      Enlarged City School District of Middletown

      Middletown High School, Middletown, NY

      • 11,000 square foot, ground floor courtyard in-fill and 27,000 square foot, third floor, instruction space additions
      • Sports lighting for 8 court tennis complex and existing softball field
      • 4-pipe unit ventilators and fan coil system
      • Secondary chilled water and hot water pumping systems
      • Domestic and sanitary plumbing systems with duplex sewage ejector system
      • Fire protection sprinklers
      • Electrical power and lighting, and fire alarm

       

      Middletown High School – Library Addition and Cafeteria Expansion

      Mechanical, Electrical, Plumbing and Fire Protection systems for 18,500 sq. ft. library addition and 9,300 sq. ft. cafeteria expansion

      • Split system air handler systems for library, gas fired packaged rooftop units for cafeteria
      • 1,000 MBH hot water boiler plant for library
      • Plumbing fixture and piping design for new restrooms, grease trap and sewage ejector pump design for prep kitchen
      • Fire protection sprinkler system modifications
      • General electrical power and lighting with detailed power design in TV studio and control room
      • Provisions for audio/visual and data network systems
      • Fire alarm system

       

      District Wide Infrastructure, Middletown, NY;

      William A. Carter Elementary, Truman Moon Elementary, Maple Hill Elementary, Twin Towers Middle, Presidential Park School, District Office, Food Service Building and Mechanics Garage

      • Installation of unit vents and replace aging vents in classrooms to meet Code
      • Fire alarm upgrades to meet Code
      • Provide air conditioning in server rooms, Computer lab and Head End room
      • Provide ventilation in storage rooms and new offices/classrooms
      • Upgrades to existing emergency EXIT light and provide new exterior emergency lights
      • Upgrades to electrical systems and site lighting

      Bronxville Union Free School District, Bronxville, NY

      • 7,500 square feet of additions for cafeteria expansion, counseling center and entrance lobby
      • 45,000 square feet of renovations for classrooms, cafeteria with servery, nurses suite, bathrooms, innovation lab and library
      • Replacement of roof mounted and split system HVAC units
      • New ducted VAV systems with DDC controls
      • Plumbing alterations and additions
      • New lighting and control systems
      • Fire alarm system additions and renovations

      Monroe Woodbury Central School District, Athletic Fields, Monroe, NY

      • New LED lighting for football stadium
      • New LED lighting for baseball field
      • New scoreboard for baseball field
      • Outlets in new varsity baseball dugouts

      Orange-Ulster BOCES

      Regional Education Center, Harriman Drive, Goshen, NY

      • Replacement and upgrade of 250 ton chiller and cooling tower with two 400 ton air cooled packaged chillers
      • Fit-up of 13,500 square feet of space for classrooms, offices and meeting rooms
      • New fan coil units to connect to existing hot and chilled water systems
      • New roof mounted HVAC unit with ducted air distribution
      • Plumbing for new bathrooms
      • Lighting and control systems
      • Fire alarm system additions

      Career and Tech Education Center, Gibson Road, Goshen, NY

      • Survey existing electrical circuit breaker panels, transformers and switchgear.
      • Develop plan for replacement of all obsolete electrical equipment.
      • Prepare construction documents for submission to State Education Department for approval and filing.

         

        Nyack High School, Nyack, NYC

        • Design alterations to the School’s 480 volt main service to incorporate a new automatic transfer switch and standby generator.
        • New 1,200 ampere, 480 volt automatic transfer switch with integral service disconnect switch
        • New underground feeder from existing service transformer to new transfer switch, and from transfer switch to existing main distribution panel
        • Connection to 600 kW, 480 volt standby generator
        • Down time to facility limited to 4 hours

         

        Byram Hills School District, NY

        Crittenden Middle School:

        • Addition of 30,000 square feet for 21 new classrooms, gymnasium and expanded cafeteria
        • Renovations of 11,000 square feet for classrooms and a music studio
        • New hot water heating for all new spaces as well as replacement of boilers
        • Chilled water based air conditioning system for all new spaces
        • Completed plumbing, power, lighting and fire protection systems
        • Communications systems and data wiring

        Coman Hill Elementary

        • Addition of 18,500 square feet for 14 new classrooms and multipurpose room
        • Renovations of 6,500 square feet for classrooms and technology center
        • New hot water heating for all new spaces
        • Direct expansion air conditioning system for all new spaces
        • Completed plumbing, power, lighting and fire protection systems
        • Communications systems and data wiring

         Wampus Elementary

        • Addition of 11,000 square feet for classrooms and a music suite
        • Renovations of 4,000 square feet for classrooms and library
        • New hot water heating for all new spaces
        • Direct expansion air conditioning system for all new spaces
        • Completed plumbing, power, lighting and fire protection systems
        • Communications systems and data wiring

         

        Clarkstown HS, New City, NY

        • Additions of 36,000 square feet to an existing high school for classrooms, science laboratories and music suite
        • Replacement fire alarm system for 160,000 square foot existing building
        • New hot water heating system for building addition
        • New sanitary plumbing fixtures and piping
        • New electrical power and lighting systems
        • New fire alarm, communications systems and data wiring

         

        Dobbs Ferry HS, Dobbs Ferry, NY

        • 39,500 square feet of building additions to an existing high/middle school for gymnasium, locker rooms, fitness center and instructional space.
        • New hot water heating systems for all new spaces
        • Renovations to 38,000 square feet of existing spaces including library, cafeteria, music suite and administrative offices.
        • Alterations to existing VAV heating systems
        • Sanitary plumbing fixtures and piping
        • Electrical power and lighting
        • Fire alarm, communications systems and data wiring

        Garrison School, Garrison, NY

        • 29,700 square feet of building additions to existing elementary/middle school for gymnasium, classrooms and science laboratories.
        • New hot water heating system for all new spaces
        • Renovations to 21,000 square feet of existing spaces, including technology lab, library, classrooms and administrative offices.
        • Alterations and additions to existing steam heat system
        • Sanitary plumbing fixtures and piping
        • Electrical power and lighting
        • Fire alarm, communications systems and data wiring

        Nanuet School District, Nanuet, NY

        Miller Elementary, Nanuet, NY

        • Renovations to 9,500 square feet of existing spaces including classrooms, administrative offices, art rooms and cafeteria.
        • Alterations and additions to hot water heating systems
        • New direct expansion air conditioning systems
        • New lighting and electrical power
        • Alterations to sanitary plumbing, fire alarm and communications systems

        Nanuet HS, Nanuet, NY

        • Additions of 9,500 square feet of classrooms to an existing high school
        • New hot water heating system for classroom addition
        • Renovations to 19,000 square feet of existing spaces including library, music suite, science laboratories, and art rooms
        • New air conditioning for an existing 833 seat auditorium
        • Alterations and additions to hot water heating systems for existing spaces
        • Alterations and additions to sanitary plumbing system.
        • Fire alarm, lighting, electrical power, communications systems and data wiring

        Beacon School District Bus Maintenance Facility, Beacon, NY

        • Design of mechanical and electrical systems for a new 10,500 square foot bus maintenance, wash and repair facility.
        • Hot water boiler heating system
        • In-floor hot water radiant heat
        • Air conditioning system for office, dispatch and break rooms.
        • Lubrication fluids dispensing fluids
        • Sanitary plumbing, electrical power fire alarm and lighting system

        Brookdale Elementary, Verona, NJ

        • 12,100 square feet of building additions to an existing elementary school for library, computer lab, cafeteria and classrooms.
        • New heating, ventilation and cooling systems for building addition
        • New sanitary plumbing fixtures and piping
        • New electrical service and distribution system
        • New electrical power and lighting
        • Renovations to 4,200 square feet of existing space
        • Additions to existing fire alarm system

        Highland Falls MS, Highland Falls, NY

        • Heating plant upgrade for a 64,000 square foot middle school
        • Replacement of two 3,150 MBH steam boilers with three 1,480 MBH boilers, new condensate return/boiler feed pumps, piping, and new boiler control systems
        • Upgrade of boiler room, including combustion air, fire detection and lighting

        Laning Elementary, Verona, NJ

        • 19,400 square feet of building additions to an existing elementary school for gymnasium, library, computer lab and classrooms.
        • New heating, ventilation and air conditioning systems for building additions
        • New sanitary plumbing fixtures and piping
        • New electrical service and distribution system
        • New electrical power and lighting
        • Additions to existing fire alarm system

        Mamaroneck Union Free School District, Mamaroneck, NY

        • Design of heating, ventilation, plumbing, electrical and communications systems associated with renovations to a 110,000 square foot public school, including a 725 seat auditorium.
        • Building Condition Surveys
        • Murray Avenue Elementary School – Renovations
        • Central Avenue Elementary School – Renovations
        • Chatsworth Elementary School – Renovations

        Monroe Woodbury Central School District, Central Valley, NY

        • Replacement of existing underground storage tanks for all facilities.
        • Additional projects include:
          • For Central Valley Elementary School: Replacement of 10,000 gallon fuel oil tank, associated piping and leak monitoring system
          • For the Education Center: Replacement of 5,000 gallon fuel oil tank, associated piping, and leak detection system
          • Harriman Elementary School: Replacement of 5,000 gallon fuel oil tank, associated piping, and leak detection system.

        Murray Avenue School, Mamaroneck, NY

        • Renovations to an existing 90,000 square foot elementary school.
        • Replacement of existing steam heating system with a new hot water system including:
          • Two 5,600 MBH boilers and associated pumps, piping and controls
          • Unit ventilators, baseboard radiation, cabinet heaters, convectors and air handler coils
        • Upgrade of existing plumbing system including:
          • Replacement of brass and steel hot and cold water piping with new copper piping
          • Replacement of steel drainage piping with a new cast iron piping
          • Replacement of selected plumbing fixtures, including faucets and associated piping
        • Upgrade of existing electrical system including:
          • Power and control wiring associated with boiler room renovations
          • Replacement of selected light fixtures, convenience outlets and associated branch wiring
          • Selective replacement and additions to fire alarm system components

        Norwood Elementary School, Norwood, NY

        • 14,800 square feet of building additions to an existing elementary school for classrooms and cafeteria.
        • New Variable Air Volume heating and cooling systems for building addition
        • Renovations to 6,000 square feet of existing spaces including classroom and technology center.
        • New sanitary plumbing fixtures and piping
        • New electrical service and distribution system
        • New electrical power fire alarm and lighting system

        Orange Ulster BOCES, Goshen, NY

        • Replacement of 57 hot water unit ventilators
        • Reconnection of existing piping and replacement of controls

        Astor School | Rhinebeck, NY

        • 18,600 square foot addition to a boarding school for special needs children, including dormitory rooms, gymnasium, offices and meeting rooms.
        • Renovations to 4,500 square feet of classrooms
        • Ground water source heat pumps for heating and cooling systems
        • Sanitary plumbing fixtures and piping
        • Fire protection sprinkler and fire alarm systems
        • Electrical power and lighting systems, including 175 kW standby generator